Reza Sarwo Widagdo (2026) “Voltage Flicker Analysis due to the Starting of 250 kW Three-Phase Induction Motor at the Karah Pump House, Surabaya ”, Jurnal Elektro dan Mesin Terapan, 12(1), pp. 31–41. doi: 10.35143/elementer.v12i1.7024.